Saturday, August 29, 2009

Light at the End of the Tunnel


Well after a grueling 5 days at 12 hours a day and water problem at another facility off site, a new bid on other construction, a stuck in the mud race car, a massive scrap and trash pile at a previous job, a water clogged valve on a heavyduty truck, a collapsed and chopped up trailer, good and bad calls from home, a doctors appointment, and numerous downpours we are proud to present to you your new completely modular skatepark, enjoy. Rails can be moved back, forward, left right and the euro gap, outledge manual pad, mellow hubba and full banks can all be moved left and right as needed. The Tranquility "replica" was not completed in time for todays reopening, but will be installed at some point afterhours next week. The rail is going to be EXACTLY the rail, all measurements are the same from the footprint positioning on the set itself...we are open today and I am almost dead, I am posting some images up on the blogger link below, please check it out and remember, from now on nothing is set in stone.



No comments:

Post a Comment